VKC Group undertakes the construction of GP Battery Factory Project

Project
GP Battery Factory
Category
EPC general contractor
Address
Hoa Mac Industrial Park, Duy Tien, Ha Nam
Construction time
25/01/2019 - 10/06/2019

GP Battery Factory Project is built on an area of 29,379 m2 in zone C, Hoa Mac industrial park, Duy Tien, Ha Nam. The project has a total investment of 6 million USD divided into two phases. VKC Group is honored to be the EPC general contractor.

With an impressive design solution as well as a very competitive price, the Package: Phase 2 and Phase 1 renovation of GP Batteries (Vietnam) LLC factory in Hoa Mac Industrial Park – Ha Nam was conducted and completed by VKC Group safely and professionally. The project was highly appreciated by the Investor from Hong Kong who believed and continued to assign to VKC Group the following works.

Các dự án khác

Mr. Minh – Thanh NGUYEN

MEP Manager - Vikoteccons

– Master of Electrical Energy and Sustainable Development -France
Electric Engineer – Ha Noi University of Science and Technology.

Minh – Thanh NGUYEN has strong knowledge of electrical system installation
and troubleshooting, and also strong knowledge of renewable energy. With
knowledge on MEPF and extensive knowledge on electrical codes and industry
practices, he can manage multiple projects and tasks.